Cost and energy estimates

EV Charging Energy Cost Calculator

Estimate grid energy and electricity cost per charging session, annually, and per mile from user-entered charging and driving data.

User-entered cost assumptions

Enter project values

kWh
%
$/kWh
sessions
mi

Charging energy cost

Estimated cost per charging session
6.67 $
Grid energy per session44.44 kWh
Annual charging cost666.67 $
Energy cost per mile0.056 $/mi
Estimate onlyAll prices, operating assumptions, efficiency values, and savings inputs are user supplied. Copper/aluminum cost comparison does not check electrical equivalence or installation suitability; lighting savings do not verify photometric equivalence.

About this calculator

Estimate grid energy and electricity cost per charging session, annually, and per mile from user-entered charging and driving data.

Uses the entered average efficiency and rate. It does not model time-of-use periods, fixed utility charges, public charging fees, charge taper, or vehicle-specific charging curves.

Method and assumptions

Grid energy per session = energy added to the battery ÷ charging efficiency. Session cost = grid energy × electricity rate. Annual cost multiplies session cost by sessions per year; cost per mile divides session cost by miles driven per session.

Results use only the user-entered prices, rates, equipment power, efficiencies, and operating schedule. They are estimates for comparison, not a bid, guarantee, or project approval.

FAQs

Are the prices or energy rates prefilled market averages?

No. Enter current project quotes, your applicable electricity rate, maintenance estimates, and operating assumptions.

Does this prove the alternatives are technically equivalent?

No. Check electrical ratings, conductor suitability, equipment listings, photometric results, and manufacturer instructions separately.

Sources

Use current supplier quotations, utility tariff information, equipment data, and project operating records for the values entered.